Final Sections of Ryan Field Being Demolished

April 22, 2024

Share this article:

Northwestern University is tearing down its old Ryan Field to build a new stadium funded by a $480 million donation from the Ryan family.  Take a look at the final sections being demolished here.

Night city skyline over a river with lit buildings and a steel bridge reflecting on the water.
October 16, 2026
Alpine Demoplition has removed the bridge’s existing west leaf and are moving forward with major removal work to prepare for the new leaf’s installation.
Yellow excavator and blue dump truck unloading soil at a large dirt mound on a construction site.
August 17, 2026
Fuel prices swing demolition estimating more than most GCs realize. Alpine breaks down how diesel, hauling routes, and escalation buffers shape every bid.
Construction worker in hard hat and safety vest inspecting debris inside a damaged building
August 10, 2026
Selective demolition removes only what needs to go and keeps the rest intact. See how it works, when it beats a full teardown, and where Alpine leads.
More Posts